6.2 9100c Planned Maintenance
This section covers the regular maintenance procedures (minimum
requirements) needed to make sure that the 9100c anesthesia
machine — including the ventilator — operates to specifications.
6.2.1 Every twelve
(12) months
Perform the following steps every 12 months.
For details, refer to the sections listed.
Parts Replacement
Replace the vaporizer port o-rings (Section 9.10).
Machine Checks and
Tests
Refer to the 9100c User’s Reference Manual.
Perform the following steps:
1. User maintenance listed below. Including disassembly,
inspection, cleaning and parts replacement as required.
• Breathing Circuit Maintenance (Section 7.5)
• Bellows Assembly Maintenance (Section 9)
• Bellows Assembly Tests (Section 9)
•O
2
Sensor Calibration (Section 9)
Refer to listed sections in this manual.
Perform the following steps:
1. MOPV pressure relief valve test (Section 6.5).
2. Exhalation valve reilef valve test (Section 6.6).
3. From the Service Mode, perform the following:
• Display Discrete I/O Signals (Section 4.4.1)
Verify proper operations of all circuit boards and switches.
• Adjust Drive Gas Regulator (Section 6.4)
• PAW Zero (Section 4.5.1)
• PAW Gain (Section 4.5.2)
• PEEP Valve (Section 4.5.4)
• Flow Zero (Section 4.5.5)
• Inspiratory Flow Valve (Section 4.5.6)
• Flow Sensor Positive (Section 4.5.7)
• Flow Sensor Negative (Section 4.5.8)
4. Inspect the system (Section 3.2)
5. Pipeline and cylinder tests (Section 3.3)
Serial Number: Date: (YY/MM/DD)
Hospital: Performed by:
12 months24 months _______________