9100c
3-18 M1207026
Turn Off all vaporizers at the end of the low-pressure leak
test.
15. Flush the system with O
2
:
• Set the O
2
flow to 1 L/min.
• Continue the O
2
flow for one minute.
• Turn the O
2
flow control fully clockwise (closed).
M1207027 004 MANUAL−DOC, Technical Reference Manual, Technical Reference Manual for 9100c, English−default
Reproduced from the electronic master in MATRIX