EasyManuals Logo

IAI PCON-CB series User Manual

IAI PCON-CB series
538 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #226 background imageLoading...
Page #226 background image
4. Operation
4.2 Operation in Positioner Mode
4-100 ME0342-4B
Note 1 It is a period of time (20ms) for a check of the calibration signal. If CLBR turns off
within this period of time, the signal should be ignored and calibration should not be
performed.
Note 2 It depends on the setting in Parameter No. 119 Loadcell Calibration Time(setting on
delivery at 10ms). If it is set to the automatic calibration at startup, the duration should
be fixed at 10ms no matter of this parameter.
CLBR being turned off within this period of time before CEND turning on should
generate Alarm 0E1 Loadcell Calibration Error”.
Reference
Loadcell is a measurement device with precision. It is necessary to have regular
calibration (adjustment by supplier) in order to maintain high precision.
Refer to [ROBO Cylinder Pulse Pressing Instruction Manual (ME3807)] for details such
as period of calibration.
Calibration Signal
CLBR
(PLC Controller)
Calibration Complete Signal
CEND
(Controller
PLC)
Calibration Period
(Note 2)
Calibration Signal
Check Period
(Note 1)

Table of Contents

Other manuals for IAI PCON-CB series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IAI PCON-CB series and is the answer not in the manual?

IAI PCON-CB series Specifications

General IconGeneral
BrandIAI
ModelPCON-CB series
CategoryController
LanguageEnglish

Related product manuals