9. Appendix
9.3 Example of Basic Positioning Sequence (PIO pattern 0 to 3)
9-30 ME0342-4B
[12] Commanded Position No. Output Circuit
Depending on the result of the ready circuit, this circuit converts position No. to the binary code
and outputs the data from PLC to PCON.
[13] Start Signal Output Circuit
After 20ms from the output of position No., this circuit outputs the start signal from PLC to
PCON.
9.3 Example of Basic Positioning Sequence (PIO pattern 0 to 3)
ME0342-4B 9-31
[14] Other Display Circuits (Zone 1, Position Zone, and Manual Mode)
Reference
Programs and functions of PLC are expressed differently depending on manufacturers.
However, the contents of sequence designs do not vary fundamentally.
Though arithmetic and data processing commands seem differently, any manufacturer
defines command words executing the same functions as those of other manufacturers.

Table of Contents

Other manuals for IAI PCON-CB series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IAI PCON-CB series and is the answer not in the manual?

IAI PCON-CB series Specifications

General IconGeneral
BrandIAI
ModelPCON-CB series
CategoryController
LanguageEnglish

Related product manuals