MAINTENANCE PROCEDURE MAINTENANCE
4-58
Front side of main valve
(F) Machine's front side
(1) Arm DIGGING (3 locations)
(2) Boom RAISE (3 locations)
(3) Bucket DIGGING (4 locations)
(4) Right travel backward (2 locations)
(5) Left travel backward (2 locations)