EasyManua.ls Logo

Oracle SPARC M8 - Page 241

Default Icon
330 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Install a Power Module
See “Returning the Server to Operation” on page 73.
5.
Verify that the fault has been cleared and the replaced component is operational.
See “Verify That a Fault Has Been Cleared” on page 54.
6.
Return the replaced component to Oracle.
See “Prepare a Component for Return to Oracle” on page 64.
Related Information
“Remove a Power Module” on page 235
Servicing Power Modules 241

Table of Contents

Other manuals for Oracle SPARC M8

Related product manuals