EasyManua.ls Logo

Oxford Instruments OpAL - Page 334

Oxford Instruments OpAL
342 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ALD Ozone Delivery System Oxford Instruments Plasma Technology
Equipment Manual
INSTALLATION
Printed: 14-Jul-10, 7:11
Page 4-2 of 4 Issue 01: July 10
4.1 Installation
If the Ozone Delivery System is supplied with a FlexAL system, the cabinet is mounted on the
FlexAL system frame (see Figure 4-1).
Figure 4-1: Mounting the cabinet on a FlexAL system
If the Ozone Delivery System is supplied with an OpAL system, the cabinet is mounted on a wall
(see Figure 4-2).
Figure 4-2: Mounting the cabinet on a wall
Refer to section 2 of this manual for a description of the required services.

Table of Contents