EasyManua.ls Logo

Physio Control LIFEPAK 15 - Page 271

Physio Control LIFEPAK 15
527 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LIFEPAK 15 Monitor/Defibrillator
Service Manual
Replacement Procedures
Energy Storage Capacitor (A15) Replacement
Section Menu Section Contents Procedures Back Index
273
8
Installing the Energy Storage Capacitor (A15)
To install the Energy Storage Capacitor into the rear case:
NOTE: When installing a new energy storage capacitor (3008164-002) use the Internal Hardware Repair Kit (MIN 3305431-015)
(p. 507) and External Hardware Repair Kit (MIN 3305431-016) (p. 507).
1. Secure the energy storage capacitor and interconnect bracket to the rear case with the large cable tie (200536-011). Place the
bottom of energy storage capacitor flush to the rear case.
2. Route the energy storage capacitor wires along left side of capacitor body.
3. Install the transfer relay assembly as described in Installing the Transfer Relay Assembly (A13).
4. Connect the energy capacitor white lead to the interconnect bracket at pin 1.
5. Connect the energy capacitor red lead to the interconnect bracket at pin 4.
6. Install the interconnect bracket as described in Installing the Interconnect Bracket (A17).
7. Install the system/therapy PCB assembly as described in System (A01)/Therapy (A04) PCB Assembly Replacement (p. 232).
8. Reassemble the case as described in Reassembling the Case (p. 184).
9. After device reassembly, complete the TCP – Defibrillator Energy Calibration procedure. The defibrillator calibration constants
may be invalidated when you replace Defibrillator Energy delivery components.

Table of Contents

Other manuals for Physio Control LIFEPAK 15

Related product manuals