EasyManuals Logo

PREVOST X3-45 Multiplex User Manual

PREVOST X3-45 Multiplex
1422 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #15 background imageLoading...
Page #15 background image
MULTIPLEX MODULES DISCONNECTION PROCEDURE PRIOR TO
WELDING
PROCEDURE NO: PR060034
REVISION 4
2007-05-31
Page 1 de 15
Material : N/A
Equipment(s) : Phillips-head screwdriver
Ratchet handle
3/8" socket
Electric tape
Long nose pliers
Reference schematics: N/A
Safety rules : - Wear safety goggles
- Set the battery master switch to the OFF position first
Recommendations: This procedure should be performed by qualified personnel only.
Effective
Revision 0 : Issued with multiplex
Revision 1 : Modified for Fire Protection System and also for VIP with multiplex
Revision 2 : Step 5 modified for introduction of VIP with multiplex -0436
Revision 3 : Step 1.15 added C397
Addition of SECTION 2 for X3 Coaches
Addition of SECTION 3 for XLII MTH
Revision 4 : Modified for introduction of CPC module for VIP,H3 Coach, X3 7-0942VIP
8-1037 H3
8-9282 X3

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the PREVOST X3-45 Multiplex and is the answer not in the manual?

PREVOST X3-45 Multiplex Specifications

General IconGeneral
Length45 ft
Width102 in
EngineVolvo D13
Horsepower500 hp
GVWR54, 000 lbs
Height146 in
Sleeping CapacityVaries based on floor plan
Water CapacityVaries based on floor plan

Related product manuals