Initial PS Installation
1. Install fittings to input and output ports, if fittings for
this application can be preinstalled.
2. Install a gear on the input shaft, if required for this
application.
3. Install the retaining nut, if required for this applica-
tion, and torque to the manufacturer's specification.
4. Position either a gasket or o-ring, dependent on the
application, which will seal the pump face to the
mounting surface.
5. Engage the input shaft.
6. Tighten the mounting bolts to manufacturer's
specifications.
7. Connect the input and output lines.
8. Fill the reservoir.
9. Start the vehicle to purge the system.
10. Turn off the vehicle andcheck the fluid level in the
reservoir. Add fluid as necessary.
11. Bleed the system if necessary using instructions on
page 36.