EasyManua.ls Logo

RKI Instruments GX-6000 - Page 256

RKI Instruments GX-6000
262 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
247 Calibrating the 10.0 eV/Benzene PID Sensor GX-6000 Operator’s Manual
5 . Press and release the POWER/ENTER button to enter the TUBE CAL
Menu.
6 . Screw the demand flow regulator onto the benzene calibration cylinder.
7 . Attach the calibration tubing to the demand flow regulator.
8 . Attach the other end of the calibration tubing to the tube holder’s inlet
fitting.
9 . Use the SHIFT (PANIC) button to place the cursor next to SINGLE
CAL.
10 . Press and release the POWER/ENTER button.
11 . An automatically-determined, temperature-based countdown is
displayed at the bottom of the screen. The number to the left of the
countdown (“5” in the example below) is the temperature code.
12 . At the end of the countdown, use the AIR or SHIFT (PANIC) button
to adjust the reading to match the concentration listed on the calibration
cylinder.
13 . Press and release the POWER/ENTER button.
TUBE CAL
GAS CALIBRATION
AUTO CAL
SINGLE CAL
ESCAPE
APPLYGAS
BNZ
5 45SEC
0.00
ppm

Table of Contents

Other manuals for RKI Instruments GX-6000

Related product manuals