5-25
E
POWR
OIL PUMP
OIL PUMP
EXPLODED DIAGRAM
REMOVAL AND INSTALLATION CHART
Step Procedure/Part name Q’ty Service points
OIL PUMP ASSEMBLY
REMOVAL
Follow the left “Step” for removal.
Oil tank Refer to “OIL TANK”.
1 Drain plug/washer 1/1 Drain engine oil.
2Bolt 6
3Bolt 1
4Bolt 1
5Bolt 2
6 Oil pump assembly 1
7Gasket 1
8Pin 2
2nd 28 N • m (2.8 kgf • m, 20 ft • Ib)
1st 15 N • m (1.5 kgf • m, 11 ft • Ib)
8 × 130 mm
6 × 25 mm
10 N • m (1.0 kgf • m, 7.2 ft • Ib)
2nd 28 N • m (2.8 kgf • m, 20 ft • Ib)
1st 15 N • m (1.5 kgf • m, 11 ft • Ib)
8 × 100 mm
2nd 28 N • m (2.8 kgf • m, 20 ft • Ib)
1st 15 N • m (1.5 kgf • m, 11 ft • Ib)
8 × 80 mm
2nd 7.6 N • m (0.76 kgf • m, 5.5 ft • Ib)
1st 3.7 N • m (0.37 kgf • m, 2.7 ft • Ib)
6 × 16 mm
LT
572
LT
LT
572
LT
18 N • m (1.8 kgf • m, 13 ft • Ib)
8 × 12 mm
LT
572
LT
1
6
8
8
3
4
5
2
7
9
9
10
Not reusable