Installation and Safety Instructions
GB
Shipment Note
1
1-5
Shipment Note
The following parts should be included in the shipment:
1 TV Signal Generator 54200
1 Users Manual (standard)
1 Power Cable (standard)
1 RF Cable BNC
-
IEC 169-2 male connector
1 IEC 162-2 male - F-male adapter
1 SCART - SCART cable
1 SCART
-
3 x Cinch cable
1 Y/C cable (only with RGB option)
Initial Inspection
Check that the shipment is complete and note whether any damage has occurred during
transport. If the contents are incomplete or there is damage, file a claim with the carrier
immediately, and notify the Fluke Sales and Service organization to facilitate the repair
or replacement of the instrument.
The functions of the instrument can be checked by using the Brief Functional Test in
Chapter 8 of this manual.
Available built-in options Fluke 54200
In addition the instruments shows the built-in options in a submenu on the display.
You can select this submenu via softkeys when the
main
screen is displayed.
If the display shows a different screen, press the
enter
softkey (F5) so often until the
main screen appears or switch the instrument off, wait five seconds, and switch it on
again.
The built-in options are marked on the type plate on the rear of the instrument.