488 Upgrade and Maintenance Manual TX140 S1
Converting a tower server to a rack server
15.8 Concluding steps
Perform the following procedures to complete the task:
Ê Close the top cover as described in section "Mounting the top cover" on
page 80.
Ê Mount the support bracket and rack mounting rails in the rack as described
in the "Rack Mounting Kit - RMK-F2 Drop-In" Mounting Instructions.
I The document is available from the ServerView Suite DVD 2 supplied
with your PRIMERGY server or online at http://manuals.ts.fujitsu.com
(EMEA market) or http://jp.fujitsu.com/platform/server/primergy/manual/
(Japanese market). The printed poster is contained in the rack
mounting kit.
Ê Mount the server in the rack as described in section "Mounting the server in
the rack" on page 87.
Ê Reconnect all external cables.
Ê Reconnect the AC power cord to the power supply unit and secure it with a
cable tie as described in section "Connecting the server to the mains" on
page 90.
Ê Close the rack door as described in section "Closing the rack door" on
page 92.
Ê Update your server’s chassis information on the Chassis ID EPROM
integrated into the front panel board. For further information on how to obtain
and use the ChassisId_Prom Tool, refer to section "Using the Chassis ID
Prom Tool" on page 119.
Ê Change the chassis model setting to "rack server" as described in section
"Specifying the chassis model" on page 121".
Ê If BitLocker functionality is used and has been disabled before starting the
maintenance task, re-enable BitLocker as described in section "Enabling
BitLocker functionality" on page 116.