EasyManua.ls Logo

GE Vivid 4 BT03 RFI - Section 4-5 System Turnover Checklist

GE Vivid 4 BT03 RFI
594 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE MEDICAL SYSTEMS
D
IRECTION 2392751-100, REVISION 3VIVID™ 4 SERVICE MANUAL
4-26 Section 4-5 - System Turnover Checklist
Section 4-5
System Turnover Checklist
Before returning the Vivid™ 4 ultrasound scanner to regular operational use, the System Configuration
settings should be checked. In 2D-Mode, press Config on the keyboard and check the settings in
accordance with those listed in Table 4-42 below, referring also to Figure 4-1 through Figure 4-6.
NOTE: The figures in this section (Figure 4-1 through Figure 4-6) show example configurations and should be
used for reference only, as each site has its own specific settings.
4-5-1 Software Configuration Checks
Table 4-42 Software Configuration Checklist
Step Task Check
1
Check the date and time settings.
2
Check the language settings.
3
Ensure that all of the options are configured correctly.
4
Ensure that the hospital details are configured correctly.
5
Ensure that the VCR and ECG are configured as required for the specific site and country.
6
Ensure that the measurement units are configured as required for the specific site and country.
7
Ensure that the connectivity network settings have not been modified and are configured as required
for the specific site.

Table of Contents

Related product manuals