EasyManua.ls Logo

GE Vivid 4 BT03 RFI - Front Board Assembly (FB); General Description

GE Vivid 4 BT03 RFI
594 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE MEDICAL SYSTEMS
D
IRECTION 2392751-100, REVISION 3VIVID™ 4 SERVICE MANUAL
5-16 Section 5-1 - Overview
5-4-2 Front Board Assembly (FB)
5-4-2-1 General Description
The FB Board has 64 identical receive channels.
The signal in each channel is fed via a Transmit/Receive (T/R) switch to a preamplifier. The next step
is a Time Controlled Gain (TGC) amplifier used to equalize the signal strength from the near-field, the
mid-field and the far-field.
Figure 5-10 Front Board Assembly Block Diagram

Table of Contents

Related product manuals