GEN7iB
175
INTERFACE/CONTROLLER
INTERFACE/CONTROLLER
11
Installation steps
1. First, make sure that the mainframe unit is switched off. Then locate the available
SFP slot and remove the plastic plug (if inserted).

86%
86%
86%
373
&$/
352%(
',63/$<32576
06
,2
9
$PD[
32:(5287
373


$%
&'

$
%
&
'
(
)
*
()
',*,7$/(9(177,0(5&2817(5
',*,7$/(9(177,0(5&2817(5
86%
86%
86%
373
&$/
352%(
',63/$<32576
06
373
373
$
%
Fig. 11.23 Interface/Controller SFP location
A Interface/Controller SFP location
B Remove cap