EasyManuals Logo

Hitachi P-N23NA2 Service Manual

Hitachi P-N23NA2
382 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #353 background imageLoading...
Page #353 background image
9 Servicing
KPI-(252-2002)(E/X)4E - Energy recovery and active energy recovery ventilation units
SMGB0099 rev.0 - 12/2016
339
9
9.11.8 Removal of the electrical box
1 Unscrew the 2 screw from the service cover (c)
2 Unplug all connectors.
3 Disconnect the power supply and communication cables
from the terminal board
4 Loosen all four screws
5 Move the electrical box slightly upwards
6 Pull it out towards yourself
4
5
6
4
4
4
6
6
9.11.9 Removal of the PCB
1 Remove the electrical box
2 Disconnect all the connectors in the PCB.
3 Remove the PCB by unlocking the four (4) plastic 
holders (*) per PCB
(*)
(*)
! CAUTION
• Do not touch the electrical components of the PCB.
• Do not apply force to the PCB, as this could damage it.
• Pay special attention to the position of the connectors on the
PCB. An incorrect position during installation may damage
the PCB.
PCB
Holder Electrical box

Table of Contents

Other manuals for Hitachi P-N23NA2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Hitachi P-N23NA2 and is the answer not in the manual?

Hitachi P-N23NA2 Specifications

General IconGeneral
BrandHitachi
ModelP-N23NA2
CategoryAir Conditioner
LanguageEnglish

Related product manuals