Table 30: Site Preparation Checklist (continued)
DatePerformed byFor More InformationItem or Task
“EX4200 Switches Hardware
Overview” on page 3
Choose the number and types of switches you
want to install.
Rack or Cabinet
“Rack Requirements for EX4200
Switches” on page 69
“Cabinet Requirements for EX4200
Switches” on page 70
Verify that your rack or cabinet meets the
minimum requirements for the installation of
the switch.
“Clearance Requirements for Airflow
and Hardware Maintenance for
EX4200 Switches” on page 72
Plan rack or cabinet location, including required
space clearances.
Secure the rack or cabinet to the floor and
building structure.
Wall
“Requirements for Mounting an
EX4200 Switch on a Desktop or Wall”
on page 71
Verify that the wall meets the minimum
requirements for the installation of the switch.
“Clearance Requirements for Airflow
and Hardware Maintenance for
EX4200 Switches” on page 72
Verify that there is appropriate clearance in your
selected location.
Cables
Acquire cables and connectors:
•
Determine the number of cables needed
based on your planned configuration.
•
Review the maximum distance supported for
each cable. Choose the length of cablebased
on the distance between the hardware
components being connected.
Plan the cable routing and management.
Related
Documentation
General Safety Guidelines and Warnings on page 267•
• General Site Guidelines on page 66
• Installing and Connecting an EX4200 Switch on page 157
• Mounting an EX4200 Switch on page 158
Copyright © 2015, Juniper Networks, Inc.62