HANDLING SERVICE CENTER ATTACHMENTS AND OPTIONS
6-28
11. Set drain valve (P) under the machine to shut position (S).
12. Push down cap lever (4) of cap (3) at the top of the sub tank, then install water filler cap (5).
13. Check that the coolant in the reserve tank is in the range between the FULL and LOW marks. For details, see
“Check Coolant Level, Add Coolant (3-160)“.