EasyManuals Logo
Home>Manitowoc>Construction Equipment>2250

Manitowoc 2250 Service And Maintenance Manual

Manitowoc 2250
410 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #223 background imageLoading...
Page #223 background image
Reference Only
Manitowoc Published 11-06-15, Control # 040-13 3-47
2250 SERVICE/MAINTENANCE MANUAL ELECTRIC SYSTEM
3
DIAGNOSTIC DISPLAY
General
The diagnostic display provides information about the status
of all main crane components as well as the controller inputs
and outputs during operation. Diagnostic screens contain:
Information about a particular crane function (DRUMS 1
through 9, CRANE SWING, TRACK, ACCUMULATOR,
and MAX-ER 2000)
Digital outputs (D1) from the controller, digital inputs
(D2) to the controller, control handle inputs (A1) to the
controller, and programmer’s screen (A2).
NOTE: See Figure 3-17
for drum identification.
Drums 1, 2, and 3 (Crane Load Drums)
1. Handle command in percent from neutral (+ raise, –
lower). For certain operating conditions the handle
command is set to neutral by the controller even if the
handle is not in neutral.
2. Pump command in percent from neutral (+ raise, –
lower).
3. Motor command in percent (0% max displacement,
100% min displacement).
4. Measured drum speed in rpm (+ raise, – lower).
5. Command to parking brake (1 release, 0 apply).
6. Command to clutch (1 disengage, 0 engage).
7. Measured pump system pressure (port A) in psi.
8. Measured pump charge pressure in psi.
NOTE: X = Corresponding drum number appears.
Drum 4 (Boom Hoist)
1. Handle command in percent from neutral (+ raise, –
lower). For certain operating conditions the handle
command is set to neutral by the controller even if the
handle is not in neutral.
2. Pump command in percent from neutral (+ raise, –
lower).
3. Motor command in percent (0% max displacement,
100% min displacement).
4. Measured drum speed in rpm (+ raise, – lower).
5. Command to parking brake (1 release, 0 apply).
6. Measured pump system pressure (port B) in psi.
NOTE: X = Corresponding drum number appears.
Drum 5 (Luffing or Auxiliary Hoist)
1. Handle command in percent from neutral (+ raise, –
lower). For certain operating conditions the handle
command is set to neutral by the controller even if the
handle is not in neutral.
2. Pump command in percent from neutral (+ raise, –
lower).
3. Motor command in percent (0% max displacement,
100% min displacement).
4. Measured drum speed in rpm (+ raise, – lower).
5. Command to parking brake (1 release, 0 apply).
6. Measured pump system pressure (port B) in psi.
NOTE: X = Corresponding drum number appears.
Drum 9 (MAX-ER 2000 Load Drum)
1. Handle command in percent from neutral (+ raise, –
lower). For certain operating conditions the handle
command is set to neutral by the controller even if the
handle is not in neutral.
2. Pump command in percent from neutral (+ raise, –
lower).
3. Motor command in percent (0% max displacement,
100% min displacement).
4. Measured drum speed in rpm (+ raise, – lower).
5. Command to parking brake (1 release, 0 apply).
6. Measured pump system pressure (port B) in psi.
NOTE: X = Corresponding drum number appears.
DRUM
X
1
5
2
6
3 4
78
DRUM
X
1 2
5
3
6
4
DRUM
X
1
5
2
6
3 4
DRUM
X
1
4
2
5
3
6

Table of Contents

Other manuals for Manitowoc 2250

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc 2250 and is the answer not in the manual?

Manitowoc 2250 Specifications

General IconGeneral
BrandManitowoc
Model2250
CategoryConstruction Equipment
LanguageEnglish

Related product manuals