Page #287 background imageLoading...
Page #287 background image
Reference Only
Manitowoc Published 11-06-15, Control # 040-13 5-29
2250 SERVICE/MAINTENANCE MANUAL HOISTS
5
DISTRIBUTING WIRE ROPE WEAR
Wire rope wear at the “critical wear points” can be reduced
and the life of the wire rope extended by moving the rope at
regular intervals so different sections of rope are subjected to
the wear points. This practice can also help correct spooling
problems and rope vibration.
To move the wire rope, cut off a piece of wire rope at the
drum and refasten it. The piece cut off should be long
enough to move wire rope at least one full drum wrap.
If the wire rope is too short to allow cutting off a piece of it,
reverse the rope end for end and refasten it.
WARNING
Falling Load Hazard!
Replacement wire rope can break if it does not meet
Manitowoc specifications given in the following
publications supplied with your crane.
Wire Rope Specifications Chart located in the
Capacity Chart Manual (for load lines)
Boom or Jib Assembly Drawings located in Crane
Operator Manual (for boom or luffing hoist)
Mast Assembly Drawing located in Parts Manual
FIGURE 5-25
S144
S145
S146
S147
S148
S149
Dog-Leg
or
Kink
Drum
Abrasion
Drum
Crushing
Sheaves
Too Small
Corrosion
Bird Cage

Table of Contents

Other manuals for Manitowoc 2250

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc 2250 and is the answer not in the manual?

Manitowoc 2250 Specifications

General IconGeneral
BrandManitowoc
Model2250
CategoryConstruction Equipment
LanguageEnglish

Related product manuals