EasyManuals Logo
Home>Manitowoc>Construction Equipment>Grove GMK4100L-1

Manitowoc Grove GMK4100L-1 User Manual

Manitowoc Grove GMK4100L-1
1016 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #216 background imageLoading...
Page #216 background image
Driving
5.1 Before driving
5 - 2 3 302 690 en Operating manual
GMK4100L-1
23.11.2017
2. When the main boom is resting on a dolly
– All telescopic sections must be locked together.
– The slewing gear is switched off;
à p. 11 - 120.
– The boom floating position must be switched on;
à p. 6 - 15.
– The slewing gear freewheel must be switched on;
à p. 6 - 14.
– The boom pre-tensioning might be switched on;
à p. 6 - 16.
– The houselock may be switched off;
à p. 11 - 17.
– The superstructure must be unlocked;
à p. 11 - 15.
– No counterweight may be mounted on the
rear counterweight
platform.
3. On the outrigger
– All outrigger beams must be fully retracted and secured to prevent
extension;
à p. 12 - 44.
– The outrigger pads are in the driving position
à p. 12 - 51.
4. – All mirrors for crane operation are folded in/removed;
à p. 12 - 130.
– All spotlights are switched off and swivelled (if possible) in such a way
that no other drivers will be blinded by reflection;
à p. 11 - 130.
– The lighting of the outrigger is switched off;
à p. 3 - 36.
5. Anemometer, air traffic control light and camera system must be
removed:
à Anemometer and air traffic control light, p. 12 - 126,
à Camera on main boom, p. 12 - 132.
6. The camera on the turntable must be retracted;
à p. 12 - 132.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK4100L-1 and is the answer not in the manual?

Manitowoc Grove GMK4100L-1 Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK4100L-1
CategoryConstruction Equipment
LanguageEnglish

Related product manuals