Driving modes
6.5 Installing/removing the outrigger beams
Operating manual 3 302 690 en 6 - 35
GMK4100L-1
23.11.2017
6.5.5 Preparations – on the truck crane
Prerequisites The following requirements must be met before mounting/removing the
outrigger beams:
All rigging work which involves slewing the superstructure has been
completed.
The parking brake is engaged.
The truck crane has been levelled with the level adjustment system;
à p. 5 - 53.
The suspension is switched off (blocked), and the symbol (1) is red;
à p. 5 - 16.
The corresponding covers have been removed (1).
If necessary, the driver's cab may need to be tilted forward in order to
reach the separator points for the front right outrigger beam.