Malfunctions during crane operation
14.7 Hydraulic emergency operation as per BGR 159
Operating manual 3 302 690 en 14 - 61
GMK4100L-1
23.11.2017
14.7.4 Connecting/removing transformer – for self-sufficiency
•
Switch the engine off.
Connecting The hoses are assigned according to the various diameters.
On the carrier
• Attach the transformer (3) to the super-
structure.
• Connect the hoses (2) to the connections (1).
Superstructure
• Connect the hoses (2) to the connections (1).
s
S
Risk of damage to the hoses
Lay the hoses in such a manner that they can be moved freely, so as to pre-
vent them being crushed or torn or becoming caught during subsequent
crane movements.