Malfunctions during crane operation
14.7 Hydraulic emergency operation as per BGR 159
Operating manual 3 302 690 en 14 - 71
GMK4100L-1
23.11.2017
14.7.9 Emergency supply of another crane
For emergency
supply
The hoses are assigned according to the various diameters.
On the crane to be supplied
Attach the transformer (3).
Attach the hoses (4); à Operating manual
of the other crane
.
On the GMK4100L-1
Switch the engine off.
Connect the hoses (2) to the connec-
tions (1).
Switch on the hydraulic emergency opera-
tion;
à p. 14 - 63.
After emergency
supply
On the GMK4100L-1
Switch off the hydraulic emergency opera-
tion;
à p. 14 - 63.
Remove the hoses (2) from the connec-
tions (1).
On the crane that was supplied
Disconnect the hoses (4).
Remove the transformer (3).
Close all the hoses and connections with
the caps.