Driving modes
6.4 Rigging the auxiliary hoist
6 - 18 3 302 690 en Operating manual
GMK4100L-1
23.11.2017
6.4.2 CHECKLIST: Installing the auxiliary hoist
The superstructure is slewed to the front.
The main boom is resting in the boom rest.
1. Attach the auxiliary hoist at the centre of gravity and remove the bolts
from the connection points;
à p. 6 - 17.
2. Lift the auxiliary hoist on to the turntable and make the connections;
à p. 6 - 20.
3. Make the hydraulic connections;
à p. 6 - 21.
Make the electrical connection;
à p. 6 - 22.
Establish the connection to the central lubrication;
à p. 6 - 23
4. Check that the auxiliary hoist is functioning properly;
à p. 6 - 25.
Place the hoist rope on and reeve it.
5. Fit the hoist rope, using the rigging aid if necessary;
à p. 6 - 26.
– Reeve the hoist rope;
à p. 12 - 108.