EasyManua.ls Logo

Manitowoc Grove GMK4100L-1

Manitowoc Grove GMK4100L-1
1016 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Rigging work
12.10 Rigging work on the main boom
12 - 108 3 302 690 en Operating manual
GMK4100L-1
23.11.2017
12.10.5 Reeving and unreeving the hoist rope
You must reeve a certain number of rope lines, depending on the required
load bearing capacity. Four reeved rope lines correspond, for example,
to 4-fall reeving;
à Possible reevings on the main boom, p. 12 - 114.
To reeve and unreeve the hoisting rope, you must remove the pocket lock.
After reeving you must reattach the pocket lock.
Removing
Remove the linchpin (4).
Release the locknuts (3) and pull out the
pins (1). Remove the bracket (2).
Slide the padlock (5) back and remove it
from the hoist rope (6).
Positioning
Insert the padlock (5) and slide it onto the
hoist rope as far as it will go (6).
Fasten the bracket (2) to the padlock (5)
using the pin (1).
Turn the locknut (3) on the pin (1) as far as it
will go and then turn by one half turn.
Insert the linchpin (4).

Table of Contents

Related product manuals