Malfunctions during crane operation
14.7 Hydraulic emergency operation as per BGR 159
14 - 62 3 302 690 en Operating manual
GMK4100L-1
23.11.2017
Removing After the emergency operation, you must disconnect the hoses and the
transformer.
On the superstructure
• Remove the hoses (2) from the connec-
tions (1).
• Close off the hoses and connections with
the caps.
On the carrier
• Remove the hoses (2) from the connec-
tions (1).
• Close off the hoses and connections with
the caps.
• Remove the transformer (3).