EasyManua.ls Logo

Manitowoc Grove GMK4100L-1

Manitowoc Grove GMK4100L-1
1016 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operating elements for crane operation
9.2 Short description of the operating elements
9 - 144 3 302 690 en Operating manual
GMK4100L-1
23.11.2017
RCL override –
version B
This point only applies to RCL programming deviating from EN 13000.
For RCL programming in accordance with EN 13000;
à p. 9 - 143.
Overriding the RCL in an emergency
No function
No function
1 Press once:
RCL shutdown overridden – crane functions
enabled
Crane functions can be started within the next
10 seconds.
Speed of movements increasing load moment
max. 15%.
à RCL override – version B, p. 11 - 67

Table of Contents

Related product manuals