Rigging work
12.8 Outrigger operation
Operating manual 3 302 690 en 12 - 63
GMK4100L-1
23.11.2017
Switching on the suspension
Select and confirm the symbol (1) once.
The symbol (2) is green if the suspension is switched on.
Now all wheels are lowered to the ground and are in the right position for
the horizontal alignment.
Switching off the suspension
Select and confirm the symbol (1) once.
The symbol (2) is red if the suspension is switched off.
To secure the truck crane
Retract the supporting cylinders until the outrigger pads are about 5 to
10 cm (2 to 4 in) above the ground. Leave the outrigger beams extended.