Appendix J Installation Consideration
198 Lynx II DSA User's Manual - 7096089
J. Installation Consideration
This unit complies with all applicable requirements. Compliance testing was performed
with application configurations commonly used for this device.
During the design and assembly of the device, precautions were taken by the manufacturer
to minimize the effects of RFI and EMC on the system. However, care should be taken to
maintain full compliance. These considerations include:
• A rack or tabletop enclosure is fully closed on all sides with rear door access.
• Single point external cable access.
• Blank panels to cover the open front panel Bin area.
• Compliant grounding and safety precautions for any internal power
distribution.
• The use of NRTL/CE compliant accessories such as fans, UPS, etc.
Preventive Maintenance
This unit does not require any periodic cleaning maintenance.
Any maintenance should be performed by a qualified Mirion Technologies service
representative.
Operating Protection Impairment
Mirion Technologies (Canberra), Inc. is not liable for any operational malfunctions or
personal injuries due to mishandling or unauthorized repair and maintenance not detailed
in this manual.
Cleaning/Decontamination
When needed, the unit may be cleaned. Remove power from the unit before cleaning.
Use only a soft cloth dampened with warm water and do not allow water to enter the
unit. Make sure the unit is fully dry before restoring power.