EasyManua.ls Logo

Omron eCobra 600 - Checking Safety Systems; Checking Robot Mounting Bolts; Checking for Oil Leakage

Omron eCobra 600
194 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 6: Maintenance
6.4 Checking Safety Systems
These tests should be done every six months.
1.
Test operation of:
l
E-Stop button on Front Panel
l
E-Stop button on pendant
l
Enabling switch on pendant
l
Auto/Manual switch on Front Panel
NOTE: Operating any of the above switches should disable high power.
2.
Test operation of any external (user-supplied) E-Stop buttons.
3.
Test operation of barrier interlocks, etc.
6.5 Checking Robot Mounting Bolts
Check the tightness of the base mounting bolts after one week, and then every 6 months.
Tighten to 85 N·m (63 ft-lbf).
Also check the tightness of all cover plate screws. Tighten to 1.6 m (14 in-lbf).
6.6 Checking for Oil Leakage
The eCobra robots use oil in the Harmonic Drive components for lubrication. Periodically
inspect the robot for any signs of oil in areas immediately outside of the Harmonic Drives.
Check these locations:
l
the area around Joint 1
l
the area around Joint 2
l
inside the base of the robot, by opening the eAIB chassis and inspecting internally.
WARNING: ELECTROCUTIONRISK
Remove all power to the robot before opening the eAIB chassis.
Contact Omron Adept Technologies, Inc. if you find any signs of oil in these areas.
14402-000 Rev. F eCobra User's Guide 103

Table of Contents

Related product manuals