136 eCobra User's Guide 14402-000 Rev. F
7.6 Installing the Robot Solenoid Kit
Figure 7-11. Solenoid Placement Using Mounting Hardware
Table 7-13. SolenoidPlacement Description
Item Description
1 Air intake coupling with spare air line
2 Tubing connected to output port
3 Mounting screws for solenoid assembly
9.
Install the appropriate lengths of 5/32 inch plastic tubing (supplied) into the two output
ports on the manifold.
10.
Route the tubing up along the tower bracket next to the quill and down through the cen-
ter of the quill. Use cable ties as needed to secure the tubing.
11.
For non-inverted robots:
a.
Loosen the securing screw on the eAIB chassis, and lower the chassis down flat.
b.
Remove the cable strap plate by removing two screws and split washers. See the
following figure. This allows the harness to move when you lift the J1 cover in
the next step. Retain the screws for re-assembly.