EasyManua.ls Logo

Oracle X6-2 - Page 171

Oracle X6-2
284 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Install the Motherboard
Servicing FRUs 171
a.
Lay the SAS cables and super capacitor cable along the left chassis sidewall
(viewing the server form the front).
You will connect these cables to the internal HBA card later.
b.
Position the mid-wall over the front of the motherboard so that it engages
the mushroom-shaped standoffs that are located on the server chassis
sidewall (one for each end of the mid-wall).
c.
Ensure that SAS cables and super capacitor cable are not pinched by the
mid-wall and that they run beside the mid-wall and not under it; otherwise,
the cables might be damaged.
d.
To secure the mid-wall to the server chassis, use a screwdriver (No. 2
Phillips or flathead) to tighten the four green captive screws.
4.
If the server has a switch card, carefully guide card cables through the chassis
mid-wall.
You will connect these cables to the switch card later.
5.
If the server has a DVD drive, carefully guide the DVD drive cable through the
mid-wall and reconnect it to the motherboard [3].
6.
To install the front indicator module (FIM) cable, push the side latches on the
motherboard connector to the open position and push the FIM cable connector
in [4].
The side latches close, locking the connector in place.
7.
Reconnect the disk backplane Auxiliary power and signal cable to the
motherboard [5].
8.
Reconnect the disk backplane power cable to the motherboard [6].
9.
Reinstall the following reusable components:
a.
If the server is equipped with the switch card, reconnect the cables to the
card and install it in PCIe slot 1.
For instructions, see “Install the Oracle PCIe NVMe Switch Card in PCIe Slot
1” on page 139.
b.
PCIe risers and attached PCIe cards
For instructions, see “Servicing PCIe Risers (CRU)” on page 97.
c.
Power supplies

Table of Contents

Related product manuals