Install a Power Supply
84 Oracle Server X6-2 Service Manual • June 2016
You will hear an audible click when the power supply fully seats.
4.
Reconnect the power cord to the power supply.
5.
Verify that the amber LED on the replaced power supply and the Service
Required LEDs on the front and rear panels of the server are not lit.
Note - After you have replaced Power Supply 0, you must reset the Oracle ILOM service
processor (SP) to propagate the key identity properties (KIP) data to the new power supply.
For instructions on resetting the SP, see the Oracle Integrated Lights Out Manager (ILOM)
3.2 Configuration and Maintenance Guide at http://www.oracle.com/goto/ilom/docs.
Power Supply 1 does not contain KIP data, and therefore does not require an SP reset after
replacement.
6.
If you disconnected the two CMA left-side connectors, reconnect the
connectors.
For instructions for reconnecting the CMA left-side connectors, refer to “Install the Cable
Management Arm” in Oracle Server X6-2 Installation Guide.
Related Information
■
“Server Back Panel View” on page 16
■
“Power Supply Status Indicators” on page 81
■
“Remove a Power Supply” on page 81