EasyManua.ls Logo

PowerTech 6105HF - Page 267

PowerTech 6105HF
450 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Camshaft and Timing Gear Train
02
050
25
RG,RG34710,196 –19–25OCT00–7/7
17. Install single nut and washer against JDG968-2
Bushing Installer. Put wrench on double nut and push
bushing in with wrench on single nut.
18. No. 3 Bushing:
NOTE: Install bushing No. 4 before installing bushing No.
3.
Install JDG968-2 Bushing Installer and JDG968-4
Alignment Sleeve with bushing in front of tower No. 5
and JDG968-3 Guide in rear of No. 6 tower.
19. Install 313793 Forcing Screw with double nut toward
rear of engine.
20. Use a 152.4 mm (6.0 in.) extension with ratchet to
reach double nut.
21. Install a new spring pin in towers 3 and 5 (bushing
locations 2 and 3).
CTM100 (06APR04)
02-050-25
P
OWER
T
ECH
10.5 L & 12.5 L Diesel Engines
040604
PN=265

Table of Contents