Setting a pump down group
Example: sewage wet well
Set a group of three pumps to pump down a wet well
Empty (2.2.4.) (Page 170)
Set the common parameters
Prerequisite: Substitute the details of your application in place of the sample values
provided. If you are bench testing the unit, set your test values to be the same as the sample
values.
Sensor Mode (2.1.3.)
Global *Level (Page 163) Operation = *Level (Page 163)
Material (2.1.6.)
Global Liquid Material = *Liquid
Response Rate (2.3.4.)
Global Medium Maximum Process Speed = *Medium
Transducer (2.1.5.)
Global XPS-10 Transducer = XPS-10 (single-point
Empty (2.2.4.)
Global 1.8 Empty = 1.8 m
1
Example assumes a single measurement unit. If your device has dual-point software
installed, then some parameters are indexed by two level points.