Commissioning preparations for PROFIBUS
2
Before you start commissioning, you will need to carry out the preparations described in this
chapter:
Requirements for commissioning
PROFIBUS components
2.1 Requirements for commissioning
The basic requirements for commissioning a SINAMICS S110 drive system are as follows:
STARTER commissioning tool
PROFIBUS interface
Wired drive line-up (see Equipment Manual)
The following diagram shows an overview of an example configuration with blocksize
components.
;
3*3&PLW67$57(5
0RWRUFDEOH
3RZHU0RGXOH
;
&RQWURO
8QLW

;
'5,9(&/L4
;
352),%86
3*3&
56
Figure 2-1 Component configuration (example)

Table of Contents