Safety Integrated Functions
8.7 Commissioning
Function Manual
434 Function Manual, 01/2011, 6SL3097-4AB10-0BP3
8.7.2.4 Information pertaining to series commissioning
Standard commissioning of the safety functions
1. A commissioned project that has been uploaded to STARTER can be transferred to
another drive unit keeping the existing Safety parameterization.
2. If the source and target devices have different software versions, the reference
checksums may have to be adapted. This is indicated by a fault:
Reference checksums Error
p9729[0…2] F01680 (fault value: 0…2)
p9399[0…1] F30680 (fault value: 0…1)
p9799 F01650 (fault value: 1000)
p9899 F30650 (fault value: 1000)
Once the project has been downloaded to the target device, an acceptance test must be
carried out. This is also indicated by fault F01650 (fault value: 2004 or 2005).
WARNING
Before re-entering the danger area and before resuming operation, a simplified function test
must be carried out for the drive affected by the component exchange (see the
"Acceptance test" chapter).