EasyManua.ls Logo

Siemens SINAMICS S110 - Page 629

Siemens SINAMICS S110
714 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Communication
9.4 Communication via PROFINET IO
Function Manual
Function Manual, 01/2011, 6SL3097-4AB10-0BP3
627
Synchronization domain
The sum of all devices to be synchronized form a synchronization domain. The whole
domain must be set to a single, specific RT class (real-time class) for synchronization,
Different synchronization domains can communicate with one another via RT.
For IRT, all IO devices and IO controllers must be synchronized with a common
synchronization master.
RT allows an IO controller to communicate with a drive unit outside a synchronization
domain or "through" another synchronization domain. As of version 5.4 SP1, STEP 7
supports multiple synchronization domains on a single Ethernet subnet.
Example:
Synchronization domain IRT : SIMOTION 2 with SINAMICS
SINAMICS, which is assigned to the IO system of SIMOTION 1, is arranged in the
topology in such a way that its RT communication must be conducted through the IRT
synchronization domain.
6\QFGRPDLQ
,57
6\QFGRPDLQ
,57
6,1$0,&6 6,1$0,&6
6,027,21
6,027,21
6,1$0,&6
&RPPXQLFDWLRQRXWVLGHWKHV\QFKURQL]DWLRQGRPDLQ
Figure 9-41 RT communication across the limits of synchronization domains
Update cycles and send cycles for RT classes
Definition of update time/send cycle:
If we take a single IO device in the PROFINET IO system as an example, this device has
been supplied with new data (outputs) by the IO controller and has transferred new data
(inputs) to the IO controller within the update time. The send cycle is the shortest possible
update cycle.
All cyclic data are transferred within the send cycle. The actual send cycle that can be set
depends on various factors:
Bus load
Type of devices used
Computing capacity available in the IO controller
Supported send clocks in the participating PROFINET devices of a synchronization
domain A typical send cycle is e.g. 1 ms
The table below specifies the reduction ratios which can be set between the send cycle and
the update times for IRT "high performance", IRT "high flexibility", and RT.

Table of Contents

Other manuals for Siemens SINAMICS S110

Related product manuals