EasyManua.ls Logo

Solare Datensysteme Solar-Log - Page 202

Solare Datensysteme Solar-Log
506 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
202
Mitsubishi
Procedure
1. Unscrew the front plate of the inverter as shown in the inverter's instructions.
2. Insert the RJ1plug into any RJ11 socket on inverter 1.
3. Insert the other end of the cable into any RJ11 socket on inverter 2.
4. Connect the other inverters to each other in the same way.
5. Terminate the last inverter.
Set the DIP switch for the terminal resistor to ON.
6. Screw the inverter front plate on again.
Allocate communication address
Recommendation: Continuous numbering starting with 1.
Setting: Using the inverter operating display
Procedure: Start according to the inverter's instructions

Table of Contents