EasyManua.ls Logo

Solare Datensysteme Solar-Log - 7.2 Albatech APL Monofase

Solare Datensysteme Solar-Log
506 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
51
Albatech
7.2 AlbatechAPLMonofase
Termination Addressing Interface
Jumper Yes RS485
APL Monofase 2.0/3.0/4.0/5.0
Inverters from different Albatech model ranges (APL monophase / triphase) cannot be mixed on an RS485 connec-
tion. The correct range must be selected when selecting inverters.
Overview
Interface not integrated; Upgrade the Albatech RS485 interface.
3-pin wiring.
Communication address must be allocated.
Installation steps:
Switch off the inverters and Solar-Log™.
Install the RS485 interface in the inverter.
Connect inverters to the Solar-Log™.
Connect the inverters to each other.
Allocate communication address.
Installing the RS485 interface
Procedure
Install the RS485 interface in the inverter in accordance with the interface card installation instructions.
Connect inverters to the Solar-Log™
The wiring is done using a
ready-made data cable (optional extra; not supplied)
or
self-made, shielded 3 wire data cable and terminal block connector.
Procedure
1. Open the inverter as shown in the inverter‘s instructions.
2. If you are making the cable yourself, connect the wires as shown in the following diagram:
Solar-Log™ terminal strip connector Inverter terminal strip
Terminal Terminal
1 Pin 2 - D+
3 Pin 3 - GND
4 Pin 1 - D-
3. If no further inverter connected, terminate the inverter:
Set the jumper on the RS485 interface card to ON.
4. Close the inverter if no other inverters are to be connected.
5. Insert the terminal block connector into the Solar-Log™ RS485 socket.

Table of Contents