EasyManua.ls Logo

Solare Datensysteme Solar-Log - Page 275

Solare Datensysteme Solar-Log
506 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
275
Schüco
Procedure
1. Open the inverter as shown in the inverter‘s instructions.
2. Connect terminals RS485+ and RS485- on all inverters to the two data cable wires in accordance with the
inverter instructions.
3. Terminate the last inverter in accordance with the inverter instructions.
4. Close inverters.
Allocate communication address
Recommendation: Continuous numbering starting with 1.
Setting: Using the inverter operating display
Procedure: Start according to the inverter‘s instructions

Table of Contents