95
Delta
Procedure
1. Connect the data cable in the free terminals of the first inverter – 2 (GND), 3 (Data+) and 4 (Data-).
2. Connect the other end of the data cable in the free terminals of the second inverter – 2 (GND), 5 (Data+) and 6
(Data-).
3. Connect the other inverters to each other in the same way.
4. Terminate the last inverter:
Set the switch inside the inverter to ON and all other inverters to OFF.
5. Close inverters.
Assign the communication address
•
Recommendation: Continuous numbering starting with 1.
•
Setting: Using the inverter operating display.
•
Procedure: Start according to the inverter‘s instructions.