EasyManuals Logo

Stryker Neptune 2 Service And Installation Manual

Stryker Neptune 2
232 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #217 background imageLoading...
Page #217 background image
Neptune Docking Station (P/N 0702-014-000)
1. Replace the offload pump impeller.
2. Replace the fresh water filter.
3. Perform procedure 6.8 Manually Raising & Lowering Docker Couplers on
page 6-43 and verify that hall sensors operate properly, and that the stepper
motor extends and retracts the couplers without interruption. Leave the
docker top cover off after verifying hall sensor operation.
4. Complete the docker testing requirements in procedure 6.5 Testing on page
6-19.
6-48

Table of Contents

Other manuals for Stryker Neptune 2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Stryker Neptune 2 and is the answer not in the manual?

Stryker Neptune 2 Specifications

General IconGeneral
BrandStryker
ModelNeptune 2
CategoryMedical Equipment
LanguageEnglish

Related product manuals