Neptune Docking Station (P/N 0702-014-000)
1. Replace the offload pump impeller.
2. Replace the fresh water filter.
3. Perform procedure 6.8 Manually Raising & Lowering Docker Couplers on
page 6-43 and verify that hall sensors operate properly, and that the stepper
motor extends and retracts the couplers without interruption. Leave the
docker top cover off after verifying hall sensor operation.
4. Complete the docker testing requirements in procedure 6.5 Testing on page
6-19.
6-48