EasyManua.ls Logo

Waters GCT Premier - Preparing the Instrument for EI;CI Operation; Changing the EI;CI Inner Source Assembly

Default Icon
382 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2-1
2 Preparing the instrument for
EI/CI operation
This chapter describes how to prepare the instrument for operation,
including how to install and remove the inner and outer source options
for electron ionization (EI) and chemical ionization (CI).
Note: For details about preparing the instrument for FI/FD operation,
including how to install and remove the FI/FD inner and outer source
options, see Chapter 9 FI/FD Operation.
Contents:
Topic Page
Changing the EI/CI inner source assembly 2-2
Changing the EI/CI outer source assembly 2-6

Table of Contents

Related product manuals