EasyManua.ls Logo

Waters GCT Premier - Setting-up for FI;FD Operation

Default Icon
382 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Setting-up for FI/FD operation 9-3
Setting-up for FI/FD operation
Recommendation: When using the FI/FD inner source probe fit the blank
flange or the GC interface to the instrument. When using the FI/FD inner
source probe with the DI probe, fit the FI/FD inner source direct insertion
probe flange.
See also: Installing the FI/FD inner source direct insertion probe only
flange on page 9-9.
Changing the FI/FD outer source assembly
Installing the FI/FD outer source
To fit the FI/FDI outer source:
1. Remove the top cover from the instrument. Lift at the back and pull
forwards to remove.
Note: FI and FD operation are run without the top cover fitted on the
instrument. This allows you to see inside the source through the clear
viewing port.
Warning: To avoid burn injuries, allow the outer source lid assembly to
cool before handling.

Table of Contents

Related product manuals