EasyManua.ls Logo

Waters GCT Premier - Page 174

Default Icon
382 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9-4 FI/FD Operation
2. Remove the EI/CI outer source assembly from the instrument.
See also: Removing the EI/CI outer source from the instrument on
page 2-6.
3. Carefully lower the FI/FD outer source lid assembly vertically into the
outer source enclosure using the two studs to ensure correct alignment.
Top cover
Reference
reservoir
pump
valve

Table of Contents

Related product manuals