97
E
HULL
HOOD
FRONT HOOD
EXPLODED DIAGRAM
Step
Procedure/Part name
Q’ty Service points
10 Bushing 6
11 Visor 1
12 Nut 6
NOTE:
Apply soapy water to the nuts to make their
installation easier.
Reverse the disassembly steps for
assembly.
2
1
4
9
5 × 16 mm
2.2 N • m (0.22 kgf • m, 1.6 ft • Ib)
5 × 16 mm
2.2 N • m (0.22 kgf • m, 1.6 ft • Ib)
5 × 17 mm
1.1 N • m (0.11 kgf • m, 0.8 ft • Ib)
10
9
10
5 × 17 mm
1.1 N • m (0.11 kgf • m, 0.8 ft • Ib)
9
10
9
10
1
1
1
7
8
12
12
5
12
12
3
6
8
11